7.33.080 REPORTING.

(a) Within sixty (60) days following the completion of work, the contractor shall submit documentation to the Public Works Department that complies with the requirements of this chapter.

(b) For a final inspection shall be required prior to determination of final compliance status and processing a request for return of deposit.

(c) The documentation shall describe diversion activities and showing actual tonnage data for diverted and disposed materials, supported by originals or certified photocopies of receipts and weight tags or other records of measurement from recycling companies, deconstruction contractors and/or landfill and disposal companies. Receipts and weight tags will be used to verify whether materials generated from the site have been or are to be recycled, reused, or salvaged.

(d) Any deposit posted pursuant to the requirements of this chapter shall be forfeited if the permittee does not furnish required documentation within 60 days of date of final inspection.

(e) On an annual basis, the Director of Public Works or designee, with assistance from the Building Division shall compile a report that, at minimum, describes the number and type of permits issued, the number and type of projects covered by diversion requirements, the total tonnage generated and the estimated diversion resulting from these projects.